Friday, June 14, 2013

Forms & Frames

Since it's been a lot of moving walls, lines, and other infrastructure changes, we haven't had a lot to update you on lately. However, we're starting to get down to it and finally have some noticeable changes to share!

First, they poured the forms for the two new pillars that will be in the grand entrance.


Then, they removed some of the glass in the show room to make way for the new entrance. Both of the pieces being removed weighed 350 lbs each!


Now the front is temporarily boarded up.

On the side of the building, they poured the footings for the stairs.

Inside, the construction crew started putting up the frames for the shop walls. This wall will enclose the area for the Service Writers. It will be climate controlled with big windows out to the Service Drive-in area.




Here's a panoramic of the framed out Service Area. It is taken from the door into the Service Drive. On the far left is our Service Manager's Office, followed by the Service Write-up area. Straight ahead is the shop.