Monday, October 7, 2013

Lots of Exterior Work

The recent rain is causing some delays on the work outside, but it's really coming along.

The exposed aggregate on the back stairs is complete.


And they're working on the exterior walkway.

The fascia is being installed as well.


Here it is along the showroom, with black on the bottom and white on top.


The crew dug a trench for the new sprinkler system and power out to the sign.

The cement for the front entrance has been poured.

They're digging up the old cement for the new Service Drive-in.

Back inside, the showroom is nearing completion.




Down in the Service Department, the tile work was completed.



and the Cashier area was painted white

Plus, the bathrooms are almost done! These will be much bigger than our current ones, and the women's bathroom will have a Baby Changing Station.


Next up is the Entrance Element (the front entrance arch),
 which will be delivered tomorrow. We can't wait! Very soon we'll be looking like this -